Sunday, February 10, 2013

Covered patio was renovated



As the indoor patio had also been damaged by the 2011 floods, it also needed a renovation. The floor was replaced with a new ceramic floor, approved by the Fire Department for not being flammable.

  


The ramp was modified for the safety and comfort of the students and the walls were repainted because, after the flood of 2011, the artistic painting unfortunately been stained. The electrical part was also reviewed, once again thinking of the safety of our students and employees.